Projects
Jufeyr
Project Status: Previous Project

Project Summary :  Jufeyr oil field is located in Khuzestan province about 50 kilometers east of Ahwaz. Contract of Jufeyr oil field development project was signed on Sep, 5, 2007 between NIOC as the client and Petroiran Development Company and Belorusneft Company as the contractors in the Buy-back format. Petroleum Belpars Company was registered in Jersey, Britain on Oct, 23, 2007.

 Jufeyr oil field is located in Khuzestan province about 50 kilometers east of Ahwaz. Contract of Jufeyr oil field development project was signed on Sep, 5, 2007 between NIOC as the client and Petroiran Development Company and Belorusneft Company as the contractors in the Buy-back format. Petroleum Belpars Company was registered in Jersey, Britain on Oct, 23, 2007. The company mission was to develop this field based on international standards in the oil and gas industry. After completion of early production phase all shares of Belorusnet in Belpars Company transferred to PEDCO and Petroiran is general contractor for development of Jufeyr oil field in next phases.


Project Objectives:
Early production phase - Production of 3,500 bbl/pd Oil and 1.7 MMscfd Gas, through drilling one new, two work-over and one appraisal well (s) in 25 months (based on JMC's approval)

PEDCO's proposal regarding definition and execution plan of next phases of this project is going to be finalized and approved by client in 2th quarter of 2013. 

Description of performed tasks:

  • Early Production Phase is being operated since August, 22, 2010 and First Phase preliminary studies are under progress now.
  • Developing dynamic and static model of reservoir
  • Completion of drilling activities related to work-over wells, a production and appraisal well
  • Completion of activities related to surface facilities
  • Completion of Topographical and Geo-technical field operations and carrying out First phase Front to End Engineering and Design
  • Provisioning part of phase one Front End Engineering Design document
  • completion of="" commissioning="" and="" operational="" activities="" early="" production="" phase="">
  • Drilling and completion of a waste water drain well in 2012 as additional work

tags projects
The South Pars Oil Field is located in the center of Persian Gulf, about 105 km from Iranian coast, and adjacent to the international boundary with ...
At the present a subsidiary company of Petroiran ,on behalf of Petroiran company has entered into contract with Iranian Offshore Oil Company (IOOC)...
The Foroozan Field is located in the Persian Gulf Approx 100 Km southwest of Kharg Island . The field is on The Iran-Saudi Arabian water borders w...
Salman complex oil and gas field contract was awarded to Petroiran for developing operation and production enhancement. Salman offshore project is...
Integrated Development Operation Enhancement of Common Fields in Foroozan & Esfandiar Areas . Foroozan and Esfandiar fields are located in the Persi...
Integrated Appraisal and Development Operations of Azadegan Field (Azadegan Oil Field Development). Azadegan field is situated in 100 km from large po...
This project was awarded to Petroiran for constructing a 289 kilometers of 32 inches subsea pipeline between Sirri Island and Assalouyeh port in addit...
Production Enhancement, Appraisal Development of Common Fields in Sirri Area (Nosrat and Farzam Oil Fields Development Project). Nosrat field is locat...
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
qrcode
© copyright 2018 Petroiran. All rights reserved
Design By ParsianGroup.com