Projects
This project has been on the go since May 2021 with the aim of carrying out conceptual studies, basic/FEED, ancillary services, preparation of EPC ten...
This project started in 2019 with the aim of enhancing production by 12,500 barrels of crude oil per day
This project started in 2018 with the aim of increasing crude oil production by 15,500 b/d.
This project started in 2018 to investigate the scenarios of EOR and EUR in Sarvestan and Saadat Abad fields.
This project started in 2019 with the aim of constructing wellhead facilities as well as transmission pipelines in Kabud Field.
The project started in 2018 with the aim of increasing production from the wells by 16,000 b/d
The project started in 2015 with the aim of increasing the capacity of Abuzar gas transmission to Darood II facility in Kharg Island
Providing integrated drilling services for 15 offshore drilling rigs and 3 onshore drilling rigs operated by IOOC
Providing integrated drilling services for 10 drilling rigs operated by Iranian Offshore Oil Company (IOOC)
Address : No. 20, Tabrizian st, Dastgerdi (Zafar) St., Shariati Ave., Tehran-Iran
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
Address : No. 20, Next To Shahid AmirSoheil Tabrizian Alley, Shahid Dastgerdi (Ex Zafar) Street, Shariati Street,
Tel : +98-21-22914811 - 18
Fax : +98-21-22914798
qrcode
© copyright 2018 Petroiran. All rights reserved
Design By ParsianGroup.com