Project Name
Appraisal and Development Operations of South Pars Oil Layer Project
Location
The South Pars Oil Field is located in the center of Persian Gulf on the Qatar-Fars high, about 100 km from Iranian coast, and adjacent to the international boundary with Qatar. |

|
|
Scope of Work
- Collecting, certifying and interpreting data, preparing reservoir models, and proposing the strategy for optimum development of the field.
- Drilling and completing 6 new horizontal wells ( 3 multilaterals and 3 single producers ).
- Drilling and extending the open hole section of the existing well.
- Construction of a wellhead platform.
- Providing production facilities including Floating Production Storage and Offloading (FPSO) vessel, mooring system and flexible pipe to transfer crude oil from wellhead platform to the FPSO vessel.
Objectives
- Production of up to 35,000 bpd of crude oil in the 1st development phase.
- Evaluating production enhancement of the field, and identifying new producing layers.
- Appraising the field and evaluating the possibility of the 2nd phase development.
Achievements
Status: 45.46% physical progress (including the additional works and updating the weight factors for calculating project progress)
> Sub-surface Studies
- Updated production forecast based on reservoir model updates using information obtained from drilling.
- Full field reservoir static and dynamic models were developed and later revised with latest available data.
- Finalized depth structure map of reservoirs
> Drilling Operations
- Drilling six new wells through the sub sea drilling template
- Compiling completion and drilling equipment list required for the tie-back and completion operation
- Preparing preliminary drilling schedule for completion phase.
> Offshore surface facilities
- The engineering design contract for the W.H.Platform was awarded to a contractor(Tecnomare) and the work was completed on December 2006.
- The received proposals of FPSO Providers are under evaluation and discussion.
- The platform's jacket fabrication was started by WHP ePCI contractor (SAFF).
- The pipeline engineering is completed.
Contract Price and Duration
The project duration is estimated 52 months (due to changes in work scope as per Final Master Development Plan).
The buyback project estimated cost (capex) is 274 MMUSD(Additional Work is not included)
|
|
|
|
|
|
|
|
|