Skip navigation links
Home
Our Company
Projects
Tender
Job Opportunities
Contacts

Foroozan & Esfandiar

 

Project Name

Integrated Development Operation Enhancement of Common Fields in Foroozan & Esfandiar Areas

Location

Foroozan and Esfandiar fields are located in the Persian gulf, on the marine border line with Saudi Arabia, about 100 km Southwest of Kharg Island.

Scope of Work

  • 3D seismic survey of both fields
  • Potential evaluation of both fields
  • Drilling of 2 appraisal wells in Foroozan field, and completion of the appraisal wells as oil producers
  • Drilling of 3 new production wells and re-entry drilling of 19 existing wells in Foroozan field.
  • Drilling of 1 appraisal well in Esfandiar field, and completion of the appraisal well as oil producers and appraising field and evaluating possibilities for its development.
  • Installation of 2 new oil processing, gas lifting and export facilities platforms, and water treatment facility.
  • Installation of a new sub-sea gas export pipeline of about 100 Km and 258 MMSCFD capacity from offshore facilities to Kharg Island.
  • Installation of infield oil and gas pipelines
  • Renovation of Foroozan living quarters, suitable for accommodating up to 70 personnel.

Objectives

  • Increasing crude oil production by 65,000 bpd in Foroozan field.
  • Installing gas export facilities to Kharg Island eliminates routine gas flaring (Foroozan field).
  • Evaluating potential increase from the field and identifying new oil bearing layers at Foroozan field.

Achievements

> Sub-surface

  • 3D seismic survey of both fields
  • Full fields reservoir simulation studies and modeling for Foroozan and Esfandiar Fields
  • Appraising Esfandiar field and evaluating possibilities for its development.

> Drilling

  • Drilling of 2 appraisal wells in Foroozan field, and completion of the appraisal wells as oil producers
  • Drilling of 3 new production wells and re-entry drilling of 19 existing wells in Foroozan field.
  • Drilling of 1 appraisal well in Esfandiar field, and completion of the appraisal well as oil producers

> Foroozan Offshore Facilities

  • Conducting sea-bed surveys for installing new platforms, gas transfer pipeline and the Submarine infield flow-lines between the platforms
  • Performing conceptual design and basic engineering of facilities
  • Purchasing 24" line pipe
  • Purchasing of Turbo Generators and Turbo Compressors
  • Facilities Basic design endorsement

 

Contract Price and Duration

Execution of the project has started on 14 May 2002 and project duration is 96 months. The buyback project contract price (latest approved capex) is 800 MMUSD.

 

 