Project Name :
Integrated Development Operation Enhancement of Common Fields in
Foroozan & Esfandiar Areas
Location
:
Foroozan and Esfandiar fields are located in the Persian gulf,
on the marine border line with Saudi Arabia, about 100 km
Southwest of Kharg Island.
|
 |
|
Scope of work :
-
3D
seismic survey of both fields
-
Potential evaluation of both fields
-
Drilling
of 2 appraisal wells in Foroozan field, and completion of
the appraisal wells as oil producers
-
Drilling
of 3 new production wells and re-entry drilling of 19
existing wells in Foroozan field.
-
Drilling
of 1 appraisal well in Esfandiar field, and completion of
the appraisal well as oil producers and appraising field and
evaluating possibilities for its development.
-
Installation of 2 new oil processing, gas lifting and export
facilities platforms, and water treatment facility.
-
Installation of a new sub-sea gas export pipeline of about
100 Km and 258 MMSCFD capacity from offshore facilities to
Kharg Island.
-
Installation of infield oil and gas pipelines
-
Renovation of Foroozan living quarters, suitable for
accommodating up to 70 personnel.
|
Objectives:
-
Increasing crude oil production by 65,000 bpd in Foroozan
field.
-
Installing
gas export facilities to Kharg Island eliminates routine gas
flaring (Foroozan field).
-
Evaluating potential increase from the field and identifying
new oil bearing layers at Foroozan field.
Achievements:
-
-
3D
seismic survey of both fields
-
Full
fields reservoir simulation studies and modeling for
Foroozan and Esfandiar Fields
-
Appraising Esfandiar field and evaluating possibilities
for its development.
-
-
Drilling of 2 appraisal wells in Foroozan field, and
completion of the appraisal wells as oil producers
-
Drilling of 3 new production wells and re-entry drilling
of 19 existing wells in Foroozan field.
-
Drilling of 1 appraisal well in Esfandiar field, and
completion of the appraisal well as oil producers
-
-
Conducting sea-bed surveys for installing new platforms,
gas transfer pipeline and the Submarine infield
flow-lines between the platforms
-
Performing conceptual design and basic engineering of
facilities
-
Purchasing 24" line pipe
-
Purchasing of Turbo Generators and Turbo Compressors
-
Facilities Basic design endorsement
|
|

|
Contract Price and Duration :
Execution of the project has started on 14 May 2002 and project
duration is 96 months. The buyback project contract price
(latest approved capex) is 800 MMUSD.
|
|