Project Name :
Production Enhancement, Appraisal Development of Common Fields
in Sirri Area (Nosrat and Farzam Oil Fields Development
Project)
Location
:
Nosrat field is located 22 km to the south of Sirri Island and
the Farzam field is located some 45 km to the southwest of Sirri
Island, in the Persian Gulf on the marine border line with the
United Arab Emirates (U.A.E.).
|
|
Scope
of work :
-
Nosrat Field
-
Drilling of two horizontal legs and completing the NT-2
well. (subsequent NIOC decision and JMC approval
required horizontal drilling and completion of this well
in other formation).
-
Drilling of horizontal legs, completion and change of
ESP in NT-4 well.
-
Drilling of new producing well (NT-5H)
-
Farzam Field
-
3-D seismic Acquisition, Processing and Interpretation
-
Sub-surface studies
-
An Exploratory/Appraisal Well Drilling
-
Drilling of 7 Development Wells
-
Offshore Facilities (Wellhead platform, subsea Oil and Water
Injection Pipelines and Power Cable)
-
Onshore (Sirri Island) Improvement to Water Injection
Facilities.
Objectives :
-
Increasing crude oil production by 11,500 bpd in Nosrat filed.
-
Production of crude oil by 15,000 bpd from Farzam field.
Achievements:
-
Sub-surface Studies of Farzam Field
-
Performed 3-D seismic Acquisition, Processing and
Interpretation
-
Full Field Reservoir Simulation has been performed.
-
Drilling Operations
-
Completed drilling and completion of Nosrat wells (NT-2H,
NT-4H and NT-5H) and achieving the objective
-
The Exploratory/Appraisal Well (FZ-1) in Farzam field was
drilled, logged, tested and suspended.
-
The development of Farzam field was suspended due to results of
studies were not complied with development requirements.
|
|

|
Contract Price and Duration :
Project
life & contract price
Execution of the project started on 17th May 2000 and it
is anticipated that the project will complete within 36 months. The project contract
price (capex) is 160 MM U.S.D.
 |
|